REZEEM KDR
Professional OverviewAn accomplished BIM (Building Information Modeling) professional with over 15+ years of experience in the AEC (Architecture, Engineering, and Construction) industry. Specialized in MEP systems and adept at advanced BIM coordination, modeling, simulation, and clash detection. Proficient in developing and implementing BIM Execution Plans (BEP) and ensuring seamless digital project delivery through cutting-edge tools and technologies.
Combines technical expertise, leadership, and innovative workflows to optimize construction processes, enhance productivity, and drive project success. Experienced in handling projects at LOD (Level of Development) 100 to 500 across diverse disciplines, ensuring full lifecycle BIM implementation, including design, 4D sequencing, 5D cost estimation, and asset management.
Profile
Technical Profile: BIM Coordinator & Lead


  • Technical Skills Core BIM ExpertiseBIM Coordination & Management: Leading multidisciplinary design coordination, clash detection, and resolution processes.
  • 4D/5D/7D Simulation: Utilizing tools like Navisworks and Synchro for project visualization, scheduling, cost estimation, and asset management.
  • LOD 100-500 Implementation: Model development and management from concept to as-built handover.
  • BIM Execution Planning (BEP): Developing project-specific BIM plans, protocols, and quality control procedures.
  • 3D Scanning: Implementing LiDAR technology for accurate as-built redline markups.
  • Tools & Software3D Modeling: Revit MEP, AutoCAD, Rhinoceros 3D, Civil 3D
  • Clash Detection & Coordination: Navisworks Manage, Revitzo, BIM 360 Collaboration
  • 4D/5D Simulation: Synchro 4D, Bexel Manager
  • Visualization: Lumion, Twinmotion, Wondershare Filmora
  • Data Analysis: Power BI
  • BIM Standards Compliance: COBie, ISO 19650, PAS 1192
  • Calculation Tools: Carrier HAP 4.51, McQuay Duct Sizer, ESP Excel
  • Industry StandardsISO 19650
  • ASHRAE
  • SMACNA
  • NFPA (National Fire Protection Association)
  • IPC (International Plumbing Code)
  • BS 8536
Professional Experience BIM MEP Coordinator & LeadDuration: Multiple Projects | Various Locations
  • Developed and implemented BIM Execution Plans (BEP) to align with client deliverables.
  • Managed 4D sequencing, 5D cost estimation, and asset management workflows, adhering to COBie and classification systems like Uniclass and Omniclass.
  • Conducted workshops and coordinated clash detection using Navisworks Manage and internal Common Data Environments (CDE).
  • Designed automated Quality Assurance/Quality Control (QA/QC) workflows, checklists, and review templates.
  • Led 3D scanning initiatives using LiDAR Technology for accurate as-built documentation.
  • Introduced Dynamo automation scripts to streamline repetitive tasks, optimizing project efficiency.
  • Facilitated seamless collaboration among stakeholders using BIM 360 Collaboration.
BIM MEP CoordinatorDuration: Previous Experience
  • Delivered BIM coordination workflows from LOD 100 to 500 for MEP systems.
  • Coordinated interdisciplinary design processes for HVAC, plumbing, and ELV systems.
  • Monitored model progression for construction readiness and post-handover facility management.
  • Conducted clash detection and resolution workshops, improving project delivery timelines.
  • Provided technical support, training sessions, and mentoring for junior engineers and interns.
  • Implemented Revit and Navisworks workflows to generate accurate 3D models and as-built documentation.
BIM MEP ModelerDuration: Early Career
  • Developed 3D models using 2D design inputs for HVAC, plumbing, and fire protection systems.
  • Produced BOQs (Bill of Quantities), BOMs (Bill of Materials), and quantity takeoffs for estimation purposes.
  • Utilized Revit MEP and Navisworks Manage for accurate design, clash analysis, and documentation.
  • Performed load calculations using Carrier HAP 4.51 and duct sizing tools.

  • Key Projects UndertakenThe Address Opera Residence (LOD 400)
  • Aspire Academy Expansion, Doha (LOD 500)
  • Museum of the Future, Dubai (LOD 300)
  • Rajiv Gandhi International Airport Extension (LOD 300)
  • 132/11kV Underground Substations (LOD 450)
  • KDCE-II Data Center, Abu Dhabi (LOD 500)
  • Mall of Saudi, KSA (LOD 400)
  • Diriyah Gate Development, Saudi Arabia
  • Reem Central Park, Abu Dhabi (LOD 400)
  • Dubai Hills Mall (LOD 400)

Other Notable Projects: Zabeel Cooling Tower, Etisalat Data Center, Boulevard Point, Rove Hotel, Wynn DCP, Riyadh Bank, Al Qiddiya Investment Park.


  • Certifications & TrainingAutodesk Certified Professional (ACP) in Revit MEP and AutoCAD
  • Sustainability in Design, Construction, and Manufacturing
  • Diploma in Heating, Ventilation, and Air Conditioning (ASHRAE, SMACNA)
  • Diploma in Fire Fighting Systems (NFPA, IPC)
  • Training in ISO 22301:2019 (Business Continuity Management System)
  • Completed 4D/5D/6D Simulation Training (Synchro, Bexel Manager)
  • Transformational AchievementsDelivered advanced BIM training sessions to engineers and senior modelers.
  • Implemented automation and LiDAR scanning workflows to enhance project accuracy and timelines.
  • Recognized with a Game Changer Award for exceptional contributions to BIM project delivery.
  • Successfully presented large-scale sustainability projects at regional exhibitions.
  • Educational Qualifications

  • Bachelor’s Degree in Mechanical Engineering
  • Professional Diploma in MEP Design
  • Master Diplomas in Revit MEP and AutoCAD
Key Projects
Here is the detailed description of the Key Projects Undertaken:
  • Key Projects UndertakenThe Address Opera Residence, Dubai (LOD 400)Scope: Responsible for full-scale BIM implementation for a high-rise luxury residential project.
  • Responsibilities:
  • Developed 3D MEP models at LOD 400 using Revit MEP based on coordinated design drawings.
  • Conducted clash detection and resolution workshops with multidisciplinary teams using Navisworks Manage.
  • Created 4D sequencing using Synchro 4D for project visualization and progress tracking.
  • Produced accurate quantity take-offs and coordinated MEP system documentation for site execution.
  • Ensured compliance with ISO standards and implemented quality control protocols.


  • Aspire Academy Expansion, Doha, Qatar (LOD 500)Scope: BIM management for a sports infrastructure expansion project, reaching full construction documentation at LOD 500.
  • Responsibilities:
  • Executed as-built 3D scanning using LiDAR technology for accurate redline markups.
  • Generated detailed 3D models for HVAC, fire protection, and plumbing systems for construction and handover phases.
  • Developed the BIM Execution Plan (BEP) and ensured compliance with COBie standards for asset management.
  • Delivered 5D cost estimation workflows using Bexel Manager.
  • Collaborated with stakeholders to achieve smooth project delivery across design, construction, and operation phases.

  • Museum of the Future, Dubai (LOD 300)Scope: BIM modeling and coordination for a world-renowned iconic structure.
  • Responsibilities:
  • Modeled MEP systems up to LOD 300, ensuring clash-free integration with architectural and structural models.
  • Conducted clash detection and analysis using Navisworks Manage.
  • Created project simulations to visualize systems’ spatial placement within the complex architectural form.
  • Implemented advanced view templates and filter systems for efficient visualization.
  • Coordinated with engineers and contractors to ensure accurate design and installation.

  • Rajiv Gandhi International Airport Extension, Hyderabad, India (LOD 300)Scope: BIM execution for HVAC and plumbing systems in an airport extension project.
  • Responsibilities:
  • Modeled HVAC ducting and plumbing systems using Revit MEP at LOD 300.
  • Performed clash detection and rectified issues between MEP systems and structural elements.
  • Generated detailed BOQs and BOMs for material procurement and project cost estimation.
  • Delivered 3D MEP shop drawings and coordinated with construction teams for site implementation.
  • Ensured compliance with ASHRAE and SMACNA standards for HVAC design.

  • 132/11kV Underground Substation (LOD 450)Scope: BIM execution and management for a high-voltage underground substation.
  • Responsibilities:
  • Delivered 3D models at LOD 450, focusing on electrical systems coordination.
  • Conducted clash analysis to ensure seamless integration with civil and structural components.
  • Generated 4D simulations to assist in project sequencing and scheduling.
  • Presented the project workflow and outcomes at the WETEX 2022 Exhibition.
  • Prepared detailed as-built documentation for handover using LiDAR scanning and COBie.

  • Dubai Hills Mall, Dubai (LOD 400)Scope: Large-scale retail project with extensive BIM coordination for MEP systems.
  • Responsibilities:
  • Created high-precision 3D MEP models at LOD 400 for HVAC, plumbing, and electrical systems.
  • Led clash detection and coordinated resolution workshops among multidisciplinary stakeholders.
  • Conducted quantity take-offs and 4D simulation for construction planning.
  • Developed QA/QC procedures for model review and optimization.
  • Streamlined BIM workflows using BIM 360 and Revitzo for efficient team collaboration.

  • KDCE-II Data Center, Abu Dhabi (LOD 500)Scope: BIM execution for a mission-critical data center project.
  • Responsibilities:
  • Modeled all MEP systems at LOD 500, ensuring readiness for construction and asset management.
  • Implemented 5D cost estimation workflows for cost control and material procurement.
  • Performed intensive clash detection to mitigate risks associated with mission-critical equipment placement.
  • Created detailed BIM Execution Plans (BEP) for standardized project workflows.
  • Coordinated with stakeholders to meet tight deadlines and ensure quality deliverables.

  • Mall of Saudi, KSA (LOD 400)Scope: High-profile retail project requiring extensive MEP coordination.
  • Responsibilities:
  • Delivered 3D MEP models at LOD 400, ensuring clash-free integration with the architectural and structural teams.
  • Generated detailed simulations and visualizations using Navisworks and Twinmotion.
  • Provided technical support and training to engineers for BIM workflows.
  • Conducted weekly coordination meetings to ensure smooth project progression and clash resolution.

  • Diriyah Gate Development, Saudi Arabia (LOD 400)Scope: Large-scale mixed-use development requiring intricate MEP system coordination.
  • Responsibilities:
  • Delivered 4D and 5D BIM models, integrating construction scheduling and cost estimation.
  • Conducted rigorous clash detection and collaborated with multiple stakeholders to resolve critical design issues.
  • Ensured high-quality deliverables by implementing QA/QC protocols.
  • Leveraged COBie standards for asset management documentation.

  • Wynn District Cooling Plant (DCP), Ras Al KhaimahScope: Execution of district cooling systems to support a large-scale development.
  • Responsibilities:
  • Modeled HVAC and cooling systems at a detailed level, ensuring LOD 400 compliance.
  • Conducted coordination workshops to resolve spatial and technical clashes.
  • Implemented automation scripts using Dynamo to optimize repetitive modeling tasks.
  • Generated as-built documentation and simulations for efficient operation and maintenance.
Your Supported Journey at London International Studies and Research Center™
London International Studies and Research Center™ is committed to supporting your journey into ethical hacking. From the moment you enroll, you will be part of a community that prioritizes hands-on learning, professional growth, and ethical responsibility.

Expert Guidance: Benefit from the insights and mentorship of experienced ethical hackers and industry professionals.

Cutting-Edge Resources:** Utilize cutting-edge tools, labs, and resources that provide a real-world hacking experience.

Networking Opportunities:
Connect with fellow trainees, alumni, and industry leaders through workshops, seminars, and networking events.

Conclusion:

Your journey into ethical hacking at London International Studies and Research Center™ is a carefully crafted experience that will equip you with the knowledge, skills, and ethical grounding needed to thrive in the field of cybersecurity. Whether you're taking your first steps or looking to advance your career, the Center's supportive environment, hands-on approach, and commitment to excellence will guide you toward success. Embark on this transformative path, and let London International Studies and Research Center™ be your partner in shaping a responsible and rewarding future in ethical hacking.